---
name: ase-workflow
description: Use when ordering a ASE paper from a frozen claim to the upload, any response the call offers, and camera-ready. Does not write those files.
---

# ASE workflow

Use this to sequence the work. Hand off to the stage skill. Do not audit the PDF here.

Camera-ready lengths differ by track on the 2026 instructions page. Pick the track before you set the page budget.

Dates move. Read the current call before you put a day on a calendar: https://conf.researchr.org/track/ase-2026/ase-2026-submission-instructions-and-policies

## Order of work

1. Freeze one claim with `ase-topic-selection`.
2. Lock the evidence with `ase-experiments` and the first page with `ase-writing-style`.
3. Write related work with `ase-related-work` while the evidence list is still short.
4. Split extra material with `ase-supplementary`. The main file has to stand alone.
5. Run `ase-submission` while you can still rebuild the PDF. Not the last hour.
6. After reviews, run `ase-author-response` only if this year has a response. Do not start a new paper.
7. After acceptance, run `ase-camera-ready`, then `ase-oral` or `ase-poster` for the slot you were given.

## What slips

| Finding | Result | Fix |
|---|---|---|
| Evidence still changing at the deadline | The PDF and the abstract disagree | Freeze the claim and the main result earlier |
| The result the claim needs is only in an appendix reviewers may skip | The paper does not contain the claim | Move it or narrow the claim |
| Response week spent on a new idea | The response is a different paper | Answer only the comments that can change the decision |
| Talk built from the PDF the night before | The slot expires mid-argument | Use the oral or poster skill when the session type is known |

Missing the deadline is the failure that matters. Confirm whether this year's deadline is described as unmovable before you tell the user it is.

## Output

```text
[ASE workflow] <name>
[Frozen claim] yes/no
[Next skill] ase-<stage>
[Unchecked] <the dates item you have not opened>
```

## Reverify each cycle

- Abstract deadline versus paper deadline, if both exist.
- Whether a checklist, a data-availability statement, or a submission number is a separate step.
- The response window, and whether a response exists at all.
- Camera-ready date and how the session type is announced.
