---
name: assets-workflow
description: Use when ordering an ASSETS technical-paper campaign from a frozen claim through the anonymous PDF, the rebuttal week, and the talk. Does not write those artifacts.
---

# ASSETS workflow

Use this to sequence the work. Hand off to the stage skill.

ASSETS 2026 snapshot, Anywhere on Earth: mentor requests by 11 March 2026, technical papers due 22 April 2026, reviews and the rebuttal window 3 June to 10 June 2026. Confirm on https://assets26.sigaccess.org/technical_papers.html

## Order of work

1. Freeze the claim with `assets-topic-selection`. Name the people.
2. If people take part, finish `study-ethics` before more interviews. Do not collect data you cannot describe.
3. Lock the access barrier and the evidence with `assets-experiments` and `assets-writing-style`.
4. Write related work with `assets-related-work`.
5. Make the PDF accessible while you write, not the night before. An inaccessible PDF is a desk reject.
6. Run `assets-submission` in the last two weeks.
7. After reviews, run `assets-author-response` inside the posted rebuttal window.
8. After acceptance, run `assets-camera-ready`, then `assets-oral` or `assets-poster`.

The mentor program is optional. A mentor is not a coauthor unless they meet the authorship rule.

## What slips

| Finding | Result | Fix |
|---|---|---|
| Ethics statement written after the study | You cannot undo the consent | Stop and use `study-ethics` |
| PDF tagged the night before the deadline | Accessibility failures become a desk reject | Check headings and alt text a week earlier |
| Rebuttal week used to start a new study | The window is days, not a cycle | Answer only the reviews that can change the decision |
| ORCID left until camera-ready | Accepted papers need one | Each author gets an ORCID before acceptance |

## Output

```text
[ASSETS workflow] <stage>
[People named] yes/no
[Ethics] done / not a human study / missing
[PDF accessibility checked] yes/no
[Next skill] assets-<stage>
```

## Reverify each cycle

- Technical-paper, rebuttal, and camera-ready dates.
- Whether a mentor track exists.
- The poster and experience-report deadlines. They are not the technical-paper deadline.
