---
name: cav-workflow
description: Use when ordering a CAV paper from a frozen claim to the upload, any response the call offers, and camera-ready. Does not write those files.
---

# CAV workflow

Use this to sequence the work. Hand off to the stage skill. Do not audit the PDF here.

Pick the CAV category first. Anonymity and the page cap depend on it. The two-stage review can reject the paper before the response window.

Dates move. Read the current call before you put a day on a calendar: http://conferences.i-cav.org/2026/cfp/

## Order of work

1. Freeze one claim with `cav-topic-selection`.
2. Lock the evidence with `cav-experiments` and the first page with `cav-writing-style`.
3. Write related work with `cav-related-work` while the evidence list is still short.
4. Split extra material with `cav-supplementary`. The main file has to stand alone.
5. Run `cav-submission` while you can still rebuild the PDF. Not the last hour.
6. After reviews, run `cav-author-response` only if this year has a response. Do not start a new paper.
7. After acceptance, run `cav-camera-ready`, then `cav-oral` or `cav-poster` for the slot you were given.

## What slips

| Finding | Result | Fix |
|---|---|---|
| Evidence still changing at the deadline | The PDF and the abstract disagree | Freeze the claim and the main result earlier |
| The result the claim needs is only in an appendix reviewers may skip | The paper does not contain the claim | Move it or narrow the claim |
| Response week spent on a new idea | The response is a different paper | Answer only the comments that can change the decision |
| Talk built from the PDF the night before | The slot expires mid-argument | Use the oral or poster skill when the session type is known |

Missing the deadline is the failure that matters. Confirm whether this year's deadline is described as unmovable before you tell the user it is.

## Output

```text
[CAV workflow] <name>
[Frozen claim] yes/no
[Next skill] cav-<stage>
[Unchecked] <the dates item you have not opened>
```

## Reverify each cycle

- Abstract deadline versus paper deadline, if both exist.
- Whether a checklist, a data-availability statement, or a submission number is a separate step.
- The response window, and whether a response exists at all.
- Camera-ready date and how the session type is announced.
